AIA Agreementsconcept

AIA document families by delivery method: DBB, Design-Build, CM, and IPD

One-line orientation

AIA publishes different agreement sets for different delivery methods. Confirm the document edition first, then match the form numbers to the parties and delivery method.

Key points

  • Design-Bid-Build (DBB): The baseline method with separate design and construction contracts.

    • Owner-Architect: B101
    • Owner-Contractor: A101 (stipulated sum, after competitive bid)
    • General Conditions: A201
  • Design-Build (DB): One entity (architect-led or contractor-led) holds design and construction.

    • Owner-Design Builder: A141
    • Architect’s services (within the design-build entity): B143
    • No A201 — the design-builder assumes full responsibility under a single agreement.
  • CM as Advisor (CM-advisor): The CM is a consultant; the owner holds the construction contract directly with a general contractor.

    • Owner-Architect: B132
    • Owner-CM as Advisor: C132
    • Owner-Contractor (GC): A132
    • General Conditions: A232 (CMa Edition — incorporated by reference into A132 and B132; A201 does not apply here)
  • CM as Constructor / CM-at-risk (CMc): The CMc takes on construction risk, typically with a GMP. Engaged during design.

    • Owner-Architect: B133
    • Owner-CMc: A133 (cost-plus fee with GMP)
    • General Conditions: A201 (referenced by A133)
  • Integrated Project Delivery (IPD): All parties collaborate from early design; shared risk and reward.

    • Transitional form: one IPD-compatible set uses B195 for owner-architect, A195 for owner-contractor, and A295 for the general conditions. Other IPD forms also exist.
    • Multi-party agreement: Single agreement signed by owner, architect, and contractor sharing risks and rewards.
    • Single-Purpose Entity (SPE): Owner, architect, and contractor form a project-specific LLC; most integrated form.

AIA document set by delivery method

SCHEMATIC

Each method is a different contract topology — the AIA number just labels each edge; the general-conditions chip is the tell that flags the trap.

View diagram Hide diagram

Scroll horizontally to explore

AIA document families drawn as five contract graphs, one per delivery method Five parallel party graphs are arranged in two rows on one grid — the top row shows DBB, DB, and CMa; the bottom row shows CMc and IPD — and each row carries three tiers labelled at the left: Owner, Parties, and General conditions. DBB: the Owner holds two agreements, B101 with the Architect and A101 with the Contractor, over A201 general conditions. DB: the Owner holds one agreement, A141, with a single Design-build entity that itself contains the Builder and the Architect linked by B143, so the architect works for the entity, not the owner, and there are no general conditions. CMa: the Owner holds three prime agreements — B132 with the Architect, A132 with the GC, and C132 with the CM advisor — over A232 CMa-Edition general conditions, not A201. CMc: the Owner holds B133 with the Architect and A133 with the CMc, over A201. IPD transitional: the Owner holds B195 with the Architect and A195 with the Contractor, over A295. The number of owner spokes and the presence or absence of a general-conditions chip identify the method with every AIA number covered. OWNERPARTIESGENERALCONDITIONSDBBDesign-bid-buildArchitectContractorB101A101A201DBDesign-buildA141Design-build entityBuilderArchitectB143noneCMaCM as advisorArchitectGCCMadvisorB132A132C132A232OWNERPARTIESGENERALCONDITIONSCMcCM at-riskArchitectCMcB133A133A201IPDIPD transitionalArchitectContractorB195A195A295

CM-advisor general conditions are A232 (CMa Edition), not A201 — A201 travels with DBB and CMc only.

C132 (owner–CM advisor) rides alongside A132 (owner–GC), not instead of it. B143 sits inside the design-build entity, so the architect works for the builder, not the owner. A133 is itself the owner–CMc agreement (cost-plus, GMP); IPD is the transitional form; DB has none.

Confusions / comparison

Delivery methodOwner-architect docOwner-contractor docGeneral conditions
Design-Bid-Build (DBB)B101A101 (stipulated sum)A201
Design-Build (DB)B143 (architect in DB entity)A141 (owner-design builder)None (A201 not used)
CM as AdvisorB132A132 (owner-GC) + C132 (owner-CM)A232 (CMa Edition)
CM as Constructor (CMc)B133A133 (cost-plus/GMP)A201
IPD — TransitionalB195A195A295
IPD — Multi-party / SPESingle multi-party agreement or SPE LLC(same)(same)

→ AIA owner-contractor documents (this module): A101 vs A133 in depth · AIA G-series forms (this module): administrative forms used in construction under any delivery method · Delivery methods comparison (same topic): the contractual risk and schedule logic behind each method.